29 · Products & Infra
One VM, twelve sites — the Zooshan hosting platform
The operational layer that makes shipping a new site a twenty-minute job: a release tarball, an install script that extracts, permissions, symlinks and reloads, and a backup routine before every change.
PeriodAug – Sep 2026StatusProductionAreaProducts & Infra
Highlights
- Per-site release directories with a current symlink; rollback is one symlink change and an nginx reload.
- Strict security headers and content-security policies per site, rate limits on upload APIs, internal ports never exposed.
- Labelled backups on the host and locally, with checksums, before each redesign.