Home/Work/№ 29

29 · Products & Infra

One VM, twelve sites — the Zooshan hosting platform

The operational layer that makes shipping a new site a twenty-minute job: a release tarball, an install script that extracts, permissions, symlinks and reloads, and a backup routine before every change.

PeriodAug – Sep 2026StatusProductionAreaProducts & Infra

Highlights

  1. Per-site release directories with a current symlink; rollback is one symlink change and an nginx reload.
  2. Strict security headers and content-security policies per site, rate limits on upload APIs, internal ports never exposed.
  3. Labelled backups on the host and locally, with checksums, before each redesign.